Context and Challenge
A homeowner in the suburbs of London decided to remove an old, unstable extension (garage and storage) to make space for a new garden. The main challenges included:
- Working in a confined space between two buildings
- Safe removal of asbestos panels
- Protecting the neighboring building from damage
solutions we provided
Execution by H&M Expert Services
H&M Expert Services conducted a detailed structural analysis and created a phased demolition plan. The team took the following steps:
- Secured the site and installed safety barriers
- Identified and marked hazardous materials (asbestos)
- Hired a certified company for asbestos removal, complying with all legal requirements
- Gradually dismantled the roof, walls, and foundations
- Transported construction waste to specialized disposal sites
The work was completed within three working days without incidents and with full compliance with safety regulations.
Result
The site was completely cleared and prepared for the next stage of the project. The client received full documentation for the disposal and destruction of hazardous materials, as well as certificates for the eco-friendly disposal of construction waste.





